reduction in new mine-development needs for selected minerals from scaled recycling by 2050
IEA APS: 40% for copper/cobalt and 25% for lithium/nickel[1]MM05 · Theme 5 of 5 · Why mining matters
You Can’t Build a Clean Energy Future From Good Intentions
Ambition matters, but wind farms, grids, batteries, electric vehicles and resilient infrastructure require real materials and credible supply chains.
What the slogan means
Targets and technology still have to be built from physical materials
The practical answer is not ‘mine everything’. It is to reduce waste, improve material efficiency, reuse products, recycle much more, diversify supply and rigorously test the remaining primary projects. Importing materials does not erase production impacts; it changes where those impacts occur and who controls the standards.
average emissions for recycled nickel, cobalt and lithium versus primary materials
IEA global average; actual performance varies by process and energy source[1]potential copper supply shortfall by 2035 from the current mine-project pipeline
IEA 2026 modelled risk, not a certain outcome[2]The practical chain
Avoid waste and unnecessary demand
Keep products and infrastructure working longer
Recover materials at end of life
Test the remaining primary need rigorously
Supporting evidence
What supports the message
The IEA scenarios below distinguish the potential contribution of recycling from the remaining requirement for primary mineral supply.
Recycling can materially reduce new mining
In the IEA Announced Pledges Scenario, scaled recycling reduces new mine-development needs by 40% for copper and cobalt and 25% for lithium and nickel by 2050. That is a major result and should be central to mineral policy.
[1]Recycling does not remove primary supply
The same IEA assessment concludes that investments in new mines remain essential because mid-century requirements remain above today’s production and existing mines naturally decline.
[1]Supply concentration is a strategic risk
The IEA reports that, excluding rare earths, the average share held by the leading refining country increased from 70% in 2023 to 72% in 2025. High concentration can turn a physical supply chain into an energy-security issue.
[2]Standards are part of the choice
Where new primary production is required, the real comparison is among projects, jurisdictions, processes and supply chains. Geology, emissions, water, biodiversity, communities, health and safety, transparency and rehabilitation all matter.
[2] [3]New Zealand relevance
Why this matters here
New Zealand’s choices about mineral production and imports sit within international supply chains, recycling opportunities and project-specific environmental standards.
A national list
New Zealand’s first Critical Minerals List identifies 37 minerals considered important and exposed to supply risk, creating a domestic basis for discussing resilience.
[3]A realistic hierarchy
Avoid demand where practical; design for long life and repair; recover and recycle; then evaluate the remaining primary supply honestly.
[1]Local is not automatically better
A New Zealand project should not receive a free pass. Its case must rest on evidence and the actual effects, controls, benefits and alternatives.
[3]Qualifications
Delivering energy targets involves choices
Energy and climate targets need accompanying plans for materials, processing, construction and maintenance.
Reuse, recovery and alternative materials can reduce demand for newly mined inputs.
Domestic production and imports involve different environmental, social and supply-security trade-offs; neither is automatically preferable.
Sources
Where the evidence comes from
Start a conversation
Need geological support for a minerals project?
Contact Wairiri about prospect evaluation, exploration programmes or the permitting work required in New Zealand.
